• español 
    • español
    • English
    • français
  • FacebookPinterestTwitter
  • español
  • English
  • français
Ver ítem 
  •   DIGIBUG Principal
  • 1.-Investigación
  • Departamentos, Grupos de Investigación e Institutos
  • Departamento de Estadística e Investigación Operativa
  • DEIO - Artículos
  • Ver ítem
  •   DIGIBUG Principal
  • 1.-Investigación
  • Departamentos, Grupos de Investigación e Institutos
  • Departamento de Estadística e Investigación Operativa
  • DEIO - Artículos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Obtaining the budget contingency reserve through the monte carlo method: Study of a ferry construction project

[PDF] V69-N3-P5-1212-OSP-Gonzalez.pdf (437.1Kb)
Identificadores
URI: https://hdl.handle.net/10481/94634
DOI: 10.21278/BROD69305
Exportar
RISRefworksMendeleyBibtex
Estadísticas
Ver Estadísticas de uso
Metadatos
Mostrar el registro completo del ítem
Autor
Para-González, Lorena; Mascaraque-Ramírez, Carlos; Madrid García, Ana Esther
Editorial
University of Zagreb
Materia
Budget Contingency Reserve
 
Monte Carlo simulation
 
Project Management
 
Shipbuilding project
 
Uncertainty
 
Fecha
2018
Referencia bibliográfica
Para-González, Lorena, et al. «Obtaining the budget contingency reserve through the monte carlo method: Study of a ferry construction project». Brodogradnja, vol. 69, n.º 3, 2018, pp. 79-95, https://doi.org/10.21278/BROD69305
Resumen
The naval sector of new construction is characterised by high cost programmes and a low degree of definition in the stages of tendering. With these requirements, an initial, highlycompetitive budget should be developed with acceptable risk. For this reason, it is usual in this field for a budget Contingency Reserve to be defined, in order to cover probable range increments, as well as probable deviations that could trigger economic losses. The budget Contingency Reserve estimate is usually carried out based on shipyard experience. However, problems arise when the shipyard does not have enough experience in the concrete type of vessel to be built. In this research, the use of an extension of the triangular Monte Carlo distribution model is proposed, with the aim of calculating the likelihood of complying with the calculated budget. From this result, a Contingency Reserve that provides enough security to execute the project within the limits of the economic risk defined by the organization can be calculated. The proposal introduced in this study allows managers to obtain a more optimal estimate of the Contingency Reserve, therefore reducing economic risks.
Colecciones
  • DEIO - Artículos

Mi cuenta

AccederRegistro

Listar

Todo DIGIBUGComunidades y ColeccionesPor fecha de publicaciónAutoresTítulosMateriaFinanciaciónPerfil de autor UGREsta colecciónPor fecha de publicaciónAutoresTítulosMateriaFinanciación

Estadísticas

Ver Estadísticas de uso

Servicios

Pasos para autoarchivoAyudaLicencias Creative CommonsSHERPA/RoMEODulcinea Biblioteca UniversitariaNos puedes encontrar a través deCondiciones legales

Contacto | Sugerencias