Afficher la notice abrégée

dc.contributor.authorArranz, Fernando
dc.contributor.authorGarrido, J.
dc.contributor.authorRouret, M.
dc.contributor.authorSanchez Herranz, Daniel
dc.date.accessioned2023-05-11T08:20:25Z
dc.date.available2023-05-11T08:20:25Z
dc.date.issued2023-03-07
dc.identifier.citationF. Arranz et al. Logistics and maintenance research activities for DONES facility. Fusion Engineering and Design 192 (2023) 113630[https://doi.org/10.1016/j.fusengdes.2023.113630 ]es_ES
dc.identifier.urihttps://hdl.handle.net/10481/81459
dc.description.abstractDONES is planned to operate on a continuous basis with only two beam stop periods per year for maintenance. The planned operational availability is 70 %, which calls for a carefully analyzed preventive maintenance. The purpose of the research is to propose a realistic and comprehensive logistics and maintenance plan. All the maintenance activities are included in a Maintenance Matrix based on the Plant Breakdown Structure of the project. This is the basis for the creation of a maintenance plan that will lead to a Work Schedule. Special mention within this matrix will be given to those Maintenance operations that must be included in order to comply with regulation. The need of replacement of components impose some requirements on the dimensions of architec tural features of the main building such as doors, airlocks, corridors and shipping bays. To enable these re placements, the flow of materials has been developed and analyzed by an intralogistics simulation with AnyLogic. The results of this simulation lead to modifications on either the building or the components such that the replacements are feasible. The periodic replacement of an activated component has been analyzed using FMEA methodology resulting in proposals for the plant equipment designers as well as the remote handling equipment designers. Virtual reality simulations are used for a staged approach to the maintenance operation. The simulation of the HEBT scraper helped to define in detail each step or the maintenance operation. This tool has proven to be very useful to prompt changes in both the plant equipment design and the remote handling equipment. Also, the procedure of the operation itself can be refined and optimized. The conclusion of the research activities is the contribution to the definition of the building, plant equipment and achievement of the target availability.es_ES
dc.description.sponsorshipEuropean Commission 101052200es_ES
dc.language.isoenges_ES
dc.rightsAtribución 4.0 Internacional*
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/*
dc.subjectDONESes_ES
dc.subjectLogistics es_ES
dc.subjectMaintenancees_ES
dc.subjectIntralogistics simulationes_ES
dc.titleLogistics and maintenance research activities for DONES facilityes_ES
dc.typejournal articlees_ES
dc.relation.projectIDinfo:eu-repo/grantAgreement/EC/Euratom Research and Training Programme/101052200es_ES
dc.rights.accessRightsopen accesses_ES
dc.identifier.doi10.1016/j.fusengdes.2023.113630
dc.type.hasVersionVoRes_ES


Fichier(s) constituant ce document

[PDF]

Ce document figure dans la(les) collection(s) suivante(s)

Afficher la notice abrégée

Atribución 4.0 Internacional
Excepté là où spécifié autrement, la license de ce document est décrite en tant que Atribución 4.0 Internacional