Status report of the n_TOF facility after the 2nd CERN long shutdown period
Metadatos
Mostrar el registro completo del ítemEditorial
Springer Nature
Materia
Neutron time-of-flight Spallation target Nuclear astrophysics Neutron physics Neutron induced fission Neutron reactions
Fecha
2023-05-17Referencia bibliográfica
Patronis, N., Mengoni, A., Goula, S. et al. Status report of the n_TOF facility after the 2nd CERN long shutdown period. EPJ Techn Instrum 10, 13 (2023). [https://doi.org/10.1140/epjti/s40485-023-00100-w]
Resumen
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.