TY - GEN AU - Salvany, J.M. AU - Aguirre Rodríguez, Julio PY - 2020 UR - http://hdl.handle.net/10481/64235 AB - A total of 208 boreholes with continuous core sampling, drilled for the construction of the high-speed train line through the city of Barcelona and other nearby infrastructures, were studied. The correlation of the lithologic logs of these boreholes... LA - eng PB - Universidad de Barcelona KW - Neogene KW - Quaternary KW - Barcelona KW - Boreholes KW - Foraminifera TI - The Neogene and Quaternary deposits of the Barcelona city through the high-speed train line DO - 10.1344/GeologicaActa2020.18.10 ER -