• español 
    • español
    • English
    • français
  • FacebookPinterestTwitter
  • español
  • English
  • français
Ver ítem 
  •   DIGIBUG Principal
  • 1.-Investigación
  • Departamentos, Grupos de Investigación e Institutos
  • Grupo: Transporte y Seguridad (TEP246)
  • TEP246 - Artículos
  • Ver ítem
  •   DIGIBUG Principal
  • 1.-Investigación
  • Departamentos, Grupos de Investigación e Institutos
  • Grupo: Transporte y Seguridad (TEP246)
  • TEP246 - Artículos
  • Ver ítem
JavaScript is disabled for your browser. Some features of this site may not work without it.

Rail track costs management for efficient railway charges

[PDF] 2013 Transport-ICE todos.pdf (229.6Kb)
Identificadores
URI: http://hdl.handle.net/10481/24451
ISSN: 0965-092X
ISSN: 1751-7710
Exportar
RISRefworksMendeleyBibtex
Estadísticas
Ver Estadísticas de uso
Metadatos
Mostrar el registro completo del ítem
Autor
Calvo Poyo, Francisco Javier; Oña López, Juan José De; López Maldonado, Griselda; Garach, Laura; Oña López, Rocío de
Editorial
Thomas Telford
Materia
Railways
 
Rail charges
 
Cost recovery
 
Rail track management
 
Track charges
 
Track costs
 
Fecha
2013
Referencia bibliográfica
Calvo, F.J.; et al. Rail track costs management for efficient railway charges. Proceedings of the Institution of Civil Engineers- Transport, (2013). [http://hdl.handle.net/10481/24451]
Patrocinador
TRYSE Research Group, Department of Civil Engineering, University of Granada, Spain
Resumen
A part of track maintenance costs is directly related to train traffic, and therefore they are marginal costs in the short term. Track renewal costs over a longer period of time also increase with traffic, so they could be considered long- term marginal costs. Many different problems can arise when applying maintenance and renewal costs to railway undertakings. With regard to the costs as such, problems arise with their magnitude, the availability and quality of data, and the service life of maintenance and renewal operations. With regard to transferring costs, problems are related to cost recovery, the relationship between track charges and the costs they intend to recover, and the level of the service the infrastructure manager gives the railway operator. A system based on a differentiated approach to maintenance cost and renewal cost depreciation is proposed as a tool for track cost processing. Cost planning and the subsequent levying the costs on railway undertakings are both based on a single concept: the theoretical traffic load. Track usage charges that promote improvements in the activity of infrastructure managers and railway undertakings alike are arrived at by combining the differentiated approach to depreciation, the theoretical traffic load, actual cost data and short-term traffic estimates.
Colecciones
  • TEP246 - Artículos

Mi cuenta

AccederRegistro

Listar

Todo DIGIBUGComunidades y ColeccionesPor fecha de publicaciónAutoresTítulosMateriaFinanciaciónPerfil de autor UGREsta colecciónPor fecha de publicaciónAutoresTítulosMateriaFinanciación

Estadísticas

Ver Estadísticas de uso

Servicios

Pasos para autoarchivoAyudaLicencias Creative CommonsSHERPA/RoMEODulcinea Biblioteca UniversitariaNos puedes encontrar a través deCondiciones legales

Contacto | Sugerencias