@misc{10481/88875, year = {2018}, url = {https://hdl.handle.net/10481/88875}, abstract = {Different pathologies may arise on a wall finish if this is applied on a hemp-based rammed wall that is not completely dry. By simulating uneven drying and early-rendering of load-bearing and non-load-bearing hemp concrete blocks (made with natural hydraulic lime only or a mix of lime with clay) and studying them by means of chromatic, microbiological, textural and morphological investigations, we found that: it is advisable to wait at least ten weeks before rendering; adding clay to hemp concrete delays drying, leading to more intense deterioration of the render; natural hydraulic lime is the preferred binder for rendering hemp concrete.}, organization = {Spanish Ministry of Economy, Industry and Competitiveness under the program ‘‘Juan de la Cierva-Incorporación” (2015 call)}, organization = {Spanish Ministry of Economy, Industry and Competitiveness under research project MAT2016-75889-R}, publisher = {ELSEVIER}, title = {Optimization of lime and clay-based hemp-concrete wall formulations for a successful lime rendering}, doi = {10.1016/j.conbuildmat.2018.06.225}, author = {Arizzi, Anna and Brummer, Monika and Martín Sánchez, Inés and Molina Piernas, Eduardo and Cultrone , Giuseppe V.}, }